常德:海绵城市建设

常德市位于湖南省西北部,近年来极端降水事件的变化显著,大雨和暴雨事件增加。 为此,常德市通过在市委市政府成立海绵城市建设领导小组和聘请中外专家会同政府相关部门编制《常德市海绵城市建设试点城市实施计划》、《常德市海绵城市专项规划》、《常德市海绵城市建设设计导则》等在体制机制和制度建设方面积极开展海绵城市建设及适应气候变化行动。 内集、外借、众筹相结合的融资机制为常德的海绵城市建设提供了充足资金,实现了政府投资的良性循环,并带动了社会资本的参与。 自2015年入选全国首批海绵城市建设试点以来,经过三年的试点建设,常德市已经成为海绵城市建设的典型案例。

下载
Download

Climate Risk and Resilence

实施国家
中国

The CRR project aims to enhance climate resilience of China’s urban centers and their rural surroundings in order to reduce human and economic losses. The project will empower local pilot cities with an ICRM approach to identify climate hazards, exposures, and vulnerabilities. Based on the risk analysis, the Chinese government can analyze occurrence probability, frequency, and severity due to climate change; localize asset geographic locations and values; and quantify the economic losses. Incorporating comprehensive socioeconomic impacts, local governments are enabled to apply climate adaptive, risk-informed measures to protect assets, businesses, and individuals.